EXPLORE THE ARCHIVE
Precast Concrete Panel Studies+ Add to bookbag
1962 1969
Drawings
Torin Corporation (Nivelles)
Preliminary Drawings+ Add to bookbag
1963-01-04 1963-01-24
Precast Concrete Panel Sketches+ Add to bookbag
Revision of South Road and Parking+ Add to bookbag
1969-10-14 1969-11-20
Preliminary Site Plans+ Add to bookbag
1962-12-31
Office Layout+ Add to bookbag
1964-02-28 1964-03-25
Elevation Studies+ Add to bookbag
Schematic Floor Plan B+ Add to bookbag
1963-01-04
Plan+ Add to bookbag
Schematic Plan+ Add to bookbag
Site Plan with Contour Map+ Add to bookbag
Elevation in Secretaries Area (East)+ Add to bookbag
Office Elevations+ Add to bookbag
1964-03-26
New Location of Elect. Trans. Rm.+ Add to bookbag
1963-03-18
Footing Detail+ Add to bookbag
1963-03-21
Top of Foundation - Exterior Wall, Alternate Proposal No. 1+ Add to bookbag
1963-03-28
Door Studies+ Add to bookbag
1963-10-11
Close