Presentation Set, Preliminary Design Development

<
Click to show Elevation (No. 1) 1 Click to show Composite Plan, Power Plant Shown with Roof Removed (No. 2) 2 Click to show Cross Section (No. 3) 3 Click to show Downstream Elevation (No. 4) 4 Click to show Elevations (No. 5) 5 Click to show Power Plant Wall Details (No. 6) 6 Click to show End Wall Plans Sections Elevations (No. 7) 7 Click to show Plans (No. 8) 8 Click to show Observation Balcony (No. 9) 9 Click to show Top Station (No. 10) 10 Click to show Cross Section (No. 11) 11 Click to show Midstation (No. 12) 12 Click to show Lower Station (No. 13) 13 Click to show Lower Station (No. 13) 14 Click to show Lower Station (No. 13A) 15
>

Date
1968-07-25 - 1968-10-04

Project Name
Grand Coulee Dam, Columbia Basin Project, Third Power Plant and Forebay Dam

Location
Grand Coulee, WA USA

Project Type


People
Weidlinger, Paul (Consultant)
Weidlinger, Paul (Engineer)
Brooks, Kenneth (Architect)

Firms
Marcel Breuer and Associates, 635 Madison Ave. New York (Architect)

Language
English

Dimensions
#SUL_dimensions

Enclosures
n/a

Repository
Syracuse University

Rights
Images supplied by the Marcel Breuer Papers, Syracuse University Library, may be used for scholarly, research, or educational purposes of a non-commercial nature. Publication of images from the Special Collections Research Center is subject to approval and fees may be charged for such use. Permission to use images must be obtained in advance and in writing from the Special Collections Research Center by emailing scrc@syr.edu or going to http://scrc.syr.edu. These permissions and fees are separate from any which might be assigned/assessed by the copyright holder.


Image ID
#SUL_image_id