- Title
- Double Door with Overhead Latch, Card Key Lock Installation on Inactive Door and Panic Bar Door Release
-
-
- Date of Original
- undated
-
-
- Format of Original
- ["Drawings"]
-
- Project Type
- ["Commercial"]
-
- Project Name
- ["IBM Administrative, Laboratory and Manufacturing Facility (Boca Raton, FL, USA, 1968-1972)"]
-
- Project Location
- ["United States--Florida--Boca Raton"]
-