Projects by Name
In July of 1956, Breuer began to design a high school for 1,800 students for the city of Torrington, CT. Breuer imagined a sprawling, low-rise building, as he had for the Litchfield High School and Bantam Elementary School. This time, the school was arranged as two, nested trapezoids containing classrooms, with a central volume dedicated to the theater, cafeteria and administration. The gymnasium and industrial arts facilities were located in rectangular volumes that framed the rest of the complex. The structure of the gymnasium was a modification of that designed for Litchfield High School, which featured laminated wood arches and a glass elevation. The project was never built.
Your search has also found results in related AM products.
Show me the resultsCopy the below link to share this set of search criteria with others. Using the link will allow others to see a list of search results on this site with the same parameters as those you've used.